Pages

Tuesday, 12 July 2016

The Shed Extension part 7

The previous part of this journey can be found here

http://shedwars.blogspot.co.uk/2016/07/the-shed-extension-part-6.html

Just a small update with regards to the progress on the new shed extension. This weekend was focussed on getting the building weatherproofed and included...

1. completing the felt roofing - done (and no I did not fall off the roof)



2. Filling in the space where the two sheds meet - done




3. Building the door and hanging this - done





and whilst the paint pot was out I decided to paint the old shed so in what in keeping with the new



The 'new' extended shed now runs a total of 39 feet in length.


Up next will be to insulate the building and sort out the electrics

part 8 here

http://shedwars.blogspot.co.uk/2016/07/the-shed-extension-part-8.html

More to come soon...

8 comments:

  1. That really is some extraordinarily impressive work. It won't be long before you're exceeding the capacity of the WHC!

    ReplyDelete
  2. A lot of hard work and dedication there!

    ReplyDelete
  3. Looks great - love the Elland Road sign (one hanging in mine too!!)

    ReplyDelete
    Replies
    1. It will go back on the outside when its all finished...come on you Whites !

      Delete
  4. Thanks for sharing Information to us. If someone wants to know about,I think this is the right place for you!
    Renovations in Hammersmith

    ReplyDelete
  5. was just browsing along and came upon your blog. just wanted to say good blog and this article really helped me.
    https://www.lcrenovation.co.uk/loft-conversion-in-hammersmith/
    Renovations in Kennington

    ReplyDelete